Pricing
What a solar system costs in Pakistan
Indicative bands so you can budget, and an explanation of why published prices in this market vary by more than three times.
Reading a quotation
Where the difference between two quotes actually lives
Published prices for a 10 kW system in Lahore run from roughly PKR 750,000 to PKR 2,500,000. Buyers assume somebody is overcharging. Usually the two quotes are simply not for the same thing.
| What to check | What a low headline price often omits | What our quotation itemises |
|---|---|---|
| Mounting structure | Light gauge structure sized for the panels but not for Lahore wind loading. | Structure specified against wind load, with the gauge and treatment stated. |
| Cable and protection | Cable gauge unstated, protection devices generic or absent from the quote. | Cable gauge, DC and AC protection, isolators and earthing all listed as line items. |
| Inverter | Brand named, model and warranty terms left vague. | Make, model, warranty term and the local service route, in writing. |
| Net billing | Your responsibility, or an extra charge discovered later. | Application prepared, filed and tracked, with the inspection attended. |
| Commissioning | System switched on and the crew leaves. | Performance verified against the design and signed off by a named engineer. |
| After year one | Unclear who to call, and whether they will still be trading. | A maintenance schedule you can buy, with response times written down. |
The spread
Why one company quotes PKR 899,000 and another quotes PKR 1.6 million
Published prices for a 10 kW system in Lahore currently run from around PKR 750,000 to PKR 2,500,000. Buyers reasonably assume somebody is overcharging. Usually the truth is that the two quotes are not for the same thing.
The difference sits in the bill of materials. Panel tier and warranty terms. Whether the inverter is hybrid or on-grid. Cable gauge and whether it is copper throughout. Mounting structure gauge and whether it is hot-dip galvanised. Protection devices. Whether the net billing application is included. Whether there is any storage at all.
We do not publish a fixed price list, because a system sized without seeing your roof and your load curve is a guess. We do publish an itemised quotation where every line has a reason, which is the only way to compare two proposals honestly.
Budgeting
What to ask for so two quotes can be compared
- Panel make, model, wattage and count, with the warranty term
- Inverter make, model and whether it is hybrid or on-grid
- Storage capacity in usable kWh, not nominal
- Cable gauge and material for both DC and AC runs
- Mounting structure specification and coating
- Protection devices, earthing and surge arrestors
- Whether the net billing application and fees are included
- What the commissioning documentation includes
Pricing questions
What does a solar system cost in Pakistan in 2026?
Why is one quote half the price of another?
How much does a battery add?
What is the payback period?
Do you offer financing?
Are there hidden costs after installation?
Will prices fall if I wait?
Can I send you a quote from someone else for review?
Send us any quote and we will tell you what is missing from it
Not to undercut it. To show you which lines are absent, because the gap between PKR 899,000 and PKR 1.6 million is almost always in the bill of materials rather than in anyone's margin.
