PENTA-H Renewable Energy

Solar solutions

Solar systems for homes, businesses and factories

One engineering team and one accountable company, whether the roof is a 10 marla house or a mill running three shifts.

Home
5 to 25 kW
Commercial
50 to 250 kW
Industrial
250 kW upward
Installations
600+

How a system works

Where every unit your roof makes actually goes

A solar installation is four things working as one: the array, the inverter, the storage and your existing grid connection. What separates a good system from an expensive one is the order in which those units are spent.

Your own load is served first. The battery is charged second. Only a genuine surplus goes to the grid, where it is worth about PKR 11.33 a unit. A system without storage skips the middle step and sells that surplus at a quarter of what it costs to buy back after dark.

  • Array, inverter and storage sized together, not separately
  • Verified against eight named hybrid inverter brands
  • Net billing filed with LESCO or MEPCO on your behalf
See PentaVault storage
Solar arrayTier one panelsHybrid inverterDeye, Solis, SungrowYour homePriority onePentaVaultPriority twoThe gridLast resort, PKR 11.33after dark
Every unit your roof makes is used in one of three places, in this order: the load running right now, the battery, then the grid. A system without storage skips the middle step and sells the surplus at a quarter of what it costs to buy back.

The record

Installations delivered
600+

Across Lahore, Multan and beyond

Bahria Town approved vendors
1 of 5

Lahore

Largest commercial rooftop
250 kW

Toyota Multan Motors

Certified EPC
AEDB

CR/22/075/C-1

By property

Choose the system that matches your site

  • Home solar and storage

    Hybrid systems for a 5 marla home up to a 2 kanal house, sized against your load curve rather than your bill, with net billing filed for you.

  • Commercial solar

    50 kW to 250 kW for clinics, showrooms, offices and warehouses, engineered for uptime with metered results you can audit.

  • Industrial solar

    250 kW upward for factories, mills and telecom sites. No upper limit, with peak shaving and industrial storage on one contract.

Systems

How the system is configured

  • Hybrid systems

    Solar, a hybrid inverter and storage working together. The sensible default since net billing changed the arithmetic in February 2026.

  • On-grid installation

    Grid tied without storage. Still right for sites that consume in daylight and can tolerate an outage.

  • Solar EPC

    Engineering, procurement and construction under one contract, with a named PEC licensed engineer accountable at every stage.

Services

What runs across every system we build

  • Net metering and net billing applications for LESCO and MEPCO
  • Consultation and system design, available standalone
  • Operations and maintenance with published response times
  • System health audits for installations by other companies
  • PentaVault storage assembled, installed and warranted by us
  • Monitoring so output can be checked against the proposal

Questions people ask before they start

Where should I start if I know nothing about solar?
With your last electricity bill. Send it to us and we will come back with an indicative system size and a price band. Then a free site survey, where an engineer measures the roof and the load and produces an itemised design. Nothing is chargeable until you accept a quotation.
How do I compare two quotes that differ by a million rupees?
Line by line, not by headline. Ask both for a bill of materials with cable gauge, structure specification and protection devices named. Published prices for a 10 kW system in Lahore span PKR 750,000 to PKR 2,500,000, and nearly all of that gap is in what has been left out.
Do I need a battery or just panels?
It depends on when you use power. Since net billing, a unit used inside your building is worth about four and a half times a unit exported. If most of your consumption is after sunset, which is true of nearly every household, the battery is what makes the arithmetic work.
What size system will I need?
For homes, typically 5 to 25 kW; for commercial premises 50 to 250 kW; industrial from 250 kW upward with no fixed ceiling. The number follows from your load curve rather than your floor area, which is why we measure before quoting.
How long does the whole process take?
Three to four weeks for a residential installation from contract to commissioning, six to twelve for commercial and industrial. Net billing approval runs alongside and depends on your DISCO queue.
What is the difference between on-grid and hybrid?
A hybrid system has a battery and an inverter that can run the building when the grid is down. An on-grid system has neither, so it shuts off during load shedding and sells its surplus at about PKR 11.33 a unit. On-grid still suits daytime loads with no outage cost.
Will you handle the net metering paperwork?
Yes, for both LESCO and MEPCO. We prepare and file the application, attend the inspection and hand you the sanctioned agreement as part of the installation contract.
What happens after the system is switched on?
You get the commissioning certificate signed by a named PEC licensed engineer, the as-built settings, the equipment serial numbers and the monitoring set up. Maintenance is available as a contract from day one but is not compulsory.

Start with the survey, not with the price

An engineer measures your roof and your load, then produces an itemised design. You can take that specification to any installer and compare quotes like for like.